• Welcomes to Kumbakonam City

    Kumbakonam is one of the oldest towns in Tamilnadu and is famous for its Mahamaham festival. In the 7th Century it was the Capital of Chola Kings. Kumbakonam, the famous temple town of South India, is picturesquely located amidst the two rivers, Cauvery and Arasalar. Read more
  • Shoping at kumbakonam

    Kumbakonam is a Special Grade Municipal Town and second biggest town in terms of administrative status in Thanjavur District. Kumbakonam, being the headquarters of Kumbakonam Taluk, had different names like Kudanthai, Kudamooku and Baskarashetram from time immemorial.. Read more
  • Kumbakonam Temples

    Kumbakonam is known for its temples and mathas (monasteries). There are around 188 Hindu temples within the municipal limits of Kumbakonam... Read more

Solar power generation still behind schedule


New Delhi: Though 21 solar projects of 28 in the first batch are ready to supply electricity, at least nine haven’t begun production, according to two people involved with India’s solar mission.
The delay prevails, even after 14 of the 28 projects that were expected to generate 140 megawatts (MW) of solar power were fined for missing deadlines in January and are now expected to begin supplying power—after adjusting for delays—from the first fortnight of March.
India’s ambitious solar mission aims for the country to generate 20,000MW of solar power in the next decade. Of these, projects worth 1,000MW were bid out to a host of companies in eight states employing both solar photovoltaic and solar thermal technologies. Of these, 500MW of solar photovoltaic power is expected by 2013, with 140MW to have been ready by January.
In a power-starved India, several recent attempts at harnessing non-conventional energy sources such as nuclear power are running into hurdles, with local protests impeding the Kudankulam nuclear power plant, and now, a host of other obstacles holding up solar power.
Though solar power is expected to contribute less than 10% to India’s energy requirements by 2020, the Jawaharlal Nehru National Solar Mission, apart from being a pivotal arm of India’s strategy to address climate change, is expected to groom a domestic solar industry and alleviate at least some of India’s energy deficit.
The key obstructions to India’s nascent solar story are inadequate infrastructure to supply this power to customers and an ongoing investigation by the ministry of new and renewable energy into whether the Lanco Group covertly bagged more projects than permitted.
Due to this, 14 companies, or half of those who were to commission their projects by January, were fined Rs 2 crore each by NTPC Vidyut Vyapar Nigam Ltd (NVVN), which coordinates the commissioning as well as power trading aspects of the solar mission, for missing their deadlines. In all, NVVN enchased a total of Rs 28 crore in bank guarantees.
Separately, the lack of a power line that connects the solar station to the main grid, which was to be built by the state electricity organization, is impeding power from a significant portion of the projects in Rajasthan.
At least “35% of these projects in Rajasthan (which hosts a bulk of the projects and was expected to churn out 100MW by January) are not supplying power to the grid”, said one of the officials involved with the solar mission. He declined to be named.
“We are expecting a report on the status of these projects, but I believe that most of them have been commissioned,” said Tarun Kapoor, joint secretary at the ministry of new and renewable energy.
The investigation into companies started after Down To Earth magazine published by advocacy group Centre for Science and Environment alleged Lanco Infratech Ltd contravened rules and got solar projects in excess of its entitlement through a network of shell companies.
Lanco Infratech has denied any wrongdoing.
Kapoor said that a team involving the ministry of corporate affairs and the ministry of new and renewable energy were looking into these allegations and were expected to come up with a report next month.
S. Bharadwaj, a former official in the ministry of new and renewable energy, said the glitches in establishing the solar projects were because of the relative inexperience of the government as well as industry in the solar energy sector.
“There are problems, but I wouldn’t say all is lost. Once the first projects actually start supplying power, it will improve transparency as well as the efficiency of the sector,” he said.
DDE Renewable Energy Pvt. Ltd, Electromech Maritech Pvt. Ltd and Finehope Allied Engineering Pvt. Ltd, all of which have build solar projects in Rajasthan and in which Lanco Infratech has a stake, did not respond to requests for comment.

Solar power to be almost at par with coal, gas by fiscal 2018

Photo: Hemant Mishra/Mint
Photo: Hemant Mishra/Mint

Mumbai: The price of solar power will be comparable to that derived from traditional fuels by fiscal 2018, according to a new report by KPMG India. The audit and consultancy firm had earlier predicted this grid parity to happen by 2020.
Grid parity is attained when the cost of solar energy equals the cost of utility power from sources such as coal, natural gas and nuclear plants.
The declining prices of solar PV (photo voltaic) modules coupled with the rising prices of traditional fuels such as coal and gas would advance the process by two years, it said in the report released on Thursday.
The report said prices of traditional fuels are going to increase by at least 4% over the next decade while prices of solar PV modules may fall by 5-7% over the next decade.
By fiscal 2018, the price of solar power will fall to Rs 6.22 per unit from the current Rs 8.34, while the cost of power from traditional sources will increase to Rs 5.79 per unit from the current Rs 4.20.
By fiscal 2019, the gap between traditional sources and solar power will be further narrowed to 20 paisa per unit.
Due to government initiatives such as the Jawharlal Nehru National Solar Mission (JNNSM), solar power generation capacity has shot up to 1,000 megawatts (MW) from 20 MW in the last two years, the report said, identifying telecom towers and agriculture water pumps as the next areas of growth for the industry.
With a growing number of towers in rural and semi-urban areas, the industry will have to increasingly depend on diesel generator sets to provide power to them towers as grid connectivity at such locations is poor.
With the consumption of diesel by the telecom industry set to increase from the current 2 billion litres to 3.5 billion litres in 2020, there’s a case for using rooftop solar panels for some 50,000 towers as of today, the report said.
Solar power can also be used to replace diesel in pump sets. India has an installed base of 25 million pump sets, with 18 million electric pump sets and around 7 million diesel pump sets.
Apart from promoting large-scale solar power plants, the report suggested that the central government and the state electricity regulators should encourage grid-connected solar power rooftops for self-consumption through a policy of net-metering which allows consumers to offset the use of costly electricity from the utility in proportion to their own solar generation.
“Rooftop solar PV is increasingly becoming an affordable option for commercial and residential consumers (with consumption more than 300 units per month) since energy charges are in the range of Rs 8-9 per unit which is quite commensurate with present solar costs,” said Ashwin Gambhir, member of Pune-based think tank Prayas Energy Group, which carries out research on policy related issues regarding energy sector.

Product List

Power solution: India opens world's largest solar park (PHOTOS)

Workers carry photovoltaic solar panels for installation at the Gujarat solar park under construction in Charanka village in Patan district of the western Indian state of Gujarat (Reuters / Amit Dave)
Workers carry photovoltaic solar panels for installation at the Gujarat solar park under construction in Charanka village in Patan district of the western Indian state of Gujarat (Reuters / Amit Dave)
The world’s largest solar power field has been switched on in India’s western state of Gujarat. Accounting for 214 megawatts of photovoltaic solar capacity, it becomes larger than China’s 200 MW Golmud Solar Park, which previously held the record.
The newly-developed solar power park will be a 500-megawatt system using state-of-the-art thin film photovoltaic technology and should be fully completed by the end of 2014. 
It now has an operational capacity of 214 MW and has already become the largest such single location in the world, spread over 3,000 acres of mainly wasteland. Gujarat environment chief S.K. Nanda says the state is ideal for the solar project because of its sparsely-populated desert in the north.
The project has become part of 600 megawatt solar energy addition to India’s power grid, including sections that were already operational.
(Reuters / Amit Dave)
Upon completion the park will reduce carbon dioxide emissions released into the atmosphere to the tune of 8 million tonnes and save around 900,000 tonnes of coal and natural gas per year.
It also gives a serious boost to India’s renewable energy ambitions. The country aims for solar power to account for 3 per cent of national capacity – or 1,000 MW – by 2013. 
Overall, it wants renewables to make up 15 per cent of capacity by 2020, from 6 per cent today.
The foundation stone for the Gujarat solar power park was laid in December 2010, as part of the state’s Solar Power Policy. The solar energy sector is expected to create about 30,000 new jobs in the state over a period of time.
The Gujarat government has already announced its next move, saying it will shortly come out with a rooftop solar power plant policy.
The state’s chief minister Narendra Modi said it will encourage people to produce their own electricity and earn by selling the surplus power to the state grid. 
This would make the people self-reliant in power generation. The authorities hope it would also encourage residents to lease out their rooftops for solar power generation, which would yield additional income for the betterment of their life.
(Reuters / Amit Dave)
(Reuters / Amit Dave)

Story of Capacity allotment of solar power projects in Gujarat


The official figures of the projects of solar energy in Gujarat are just released. The government of Gujarat has ousted it's own target! It has allotted 716 MW of Solar Power capacity to 34 national and international project developers against the 500 MW capacity declared earlier this year under its Solar Power Policy -2009.
Even though the number of companies in photovoltaic technology is higher (24) as compared to concentrated solar power (10), the capacity split is almost equal. This can be attributed to the large-scale requirement of CSP plants. Some of these projects were already discussed at Solarishi!
On analyzing, contrary to the perception, most of the companies which are allocated projects in Gujarat solar energy space are Indian companies while only one-fourth of them are multinational companies.

Most of the companies are establishing solar energy projects in the range of 10-20 MW. However, there are nine projects which will have capability in the range of 30 MW and above. This reflects the trend towards smaller projects in split geography. There are plans for larger projects such as the one planned by Clinton Foundation but that will take time.

Name of the PV Company
MW
Name of the CSP Company
MW
PLG Power Ltd., Nasik
40
Sun Borne Energy Technologies Gujarat L.
50
Lanco Solar P. Ltd. Hyderabad
35
NTPC, New Delhi
50
25
ACME Telepower Ltd.Gurgaon
46
Dreisatz GmbH, Germany
25
Adani Power Ltd., Ahmedabad
40
Mi GmbH, Germany
25
Electrotherm Ltd., Ahmedabad
40
Torrent Power Ltd., Ahmedabad
25
Abengoa Ltd., Spain
40
Solar Semiconductor P. Ltd. Hyderabad
20
Welspun Urja Ltd. Ahmedabad
40
Waree Energies Ltd. Surat
20
Cargo Motors, Delhi
25
AES Solar Energy P. Ltd,USA
15
IDFC, Delhi
10
Azure Power Ltd. USA
15
KG Design Services P. Ltd., Coimbtore
10
Moser Baer Ltd. NOIDA
15
Total of CSP Projects
351
Precious Energy Ltd. (Moser Bear) New Delhi
15


Solitaire Energies Ltd, (Moser Bear) New Delhi
15


Common Wealth Business Technologies, UK
10


Millenium Synergy Ltd., Bangalore
10


Sunkon Energy P. Ltd. Surat
10


10


Environmental Systems Pvt. Ltd. Mumbai
5


Euro Solar Ltd., Bhachau
5


JSW Energy, Mumbai
5


KRIBHCO, Surat
5


Tathith Energies USA
5


Top Sun Energy Ltd., Gandhinagar
5


Unity Power Ltd. (Videocon Group), Aurangabad
5


Total of PV Projects
365




Source: GEDA

Some of the key benefits through development of solar projects will be:
·         Investment of over INR 12000 Crores into Gujarat
·         1250 Million units of Green energy annually
·         Employment to over 5000 people
·         Avoiding use of 8.75 lac tones of coal and 12.50 lac tonnes of carbon dioxide emission annually

Story of solar energy powered billboards in Gujarat




After the conventional uses of solar energy, Gujarat government has taken a step forward with an initiative to power the billboards with solar power. This would obviously be a low compared to total energy consumption. But as one likely said, a drop each time fills up the ocean!
On the initiative, the government is likely to set-up a state-level steering committee to lay down guidelines with the help of Departments of Forest, Energy and Urban Development. It will be implemented in seven big cities namely, Ahmedabad, Vadodara, Surat, Rajkot, Jamnagar, Junagadh and Bhavnagar. This has come up live in the moment of IPL which has gone into huge level of billboard advertising. With many such events coming up, the outdoor advertising has again come up in the limelight. Other reality-based shows/ events such as Indian Idol (Singing) and Dance India Dance (Dancing) have been the major driver of billboard advertising on a regular basis.
 
Let us analyze the technology costs and some benefits of solar power billboards.
Currently the solar powered billboards come with an ability to operate 4, 6, 8 or 10 hours a night based on the battery storage capability. The PV panels can illuminate from one/ two sides of a 30-feet wide billboard depending upon the requirements. The current price of a sample billboard is approximately INR 2, 10,000 for a 2 panel, 318 AHR battery back-up, two-side lighting, solar-powered billboard system.
Some of the benefits of a solar-powered bill-board system are:
·         do not need to run underground wire from the nearest electrical transformer to the billboard
·         do not need to pay the additional costs of digging trenches for underground wiring
·         allows the outdoor advertiser to provide consistent, affordable lighting to billboard locations without the need to negotiate with property owners to use their property for underground wiring and landscaping
·         no need to meter and bill the Billboard Lighting System.
In India, the outdoor advertising accounts for 7% (USD 245 million) of the total advertising industry USD 3.5 billion growing at a growth rate of 20%. The outdoor advertising industry is led by a few major players like Selvel Vantage, Madison Outdoor, Portland and Posterscope. This presents a huge market opportunity for solar powered billboards in the metros and tier-2 and tier-3 cities in India.
 
Next is what? Solar powered buses and AC bus-stops!!!

Bright gadgets, dull designs


I like solar-powered gadgets. Partly it’s a desire to go green and save money on electricity bills, and partly it’s the geek in me. Over the years, I have acquired quite a few solar garden lights, solar lamps for my desk and a floating solar fountain. Some were bought, and many came as gifts.

Solar lamps: These have LEDs that last longer than traditional bulbs. Courtesy Ikea

Then there were the solar sunflowers that were available at traffic lights a year ago. I must have purchased at least two dozen of these as gifts for friends abroad. We used to have a pair on a windowsill at home, and one day the leaves simply stopped moving. I tried to fix it but threw it away when I couldn’t put it back together. Now they are no longer available on the streets.
The Solar-Powered Double Rainbow Maker hanging on our window fills the room with splashes of colourful light. It has a tiny solar panel, a simple see-through mechanism and two hanging crystals. Every morning, for two or three hours when the rays of the sun fall directly on the solar panel, the tiny machine starts whirring and the two rotating crystals throw rainbow colours on the walls of the room. It’s a fun toy to have around (search for Kikkerland Solar-Powered Double Rainbow Maker on Amazon).
My longest-running solar gadget, and the one I found most useful, was the floating water fountain that I had put in a large pot in the garden. Throughout the day birds would come to drink water, balance themselves gingerly on the floating gizmo, bathe quickly under the sprinkle, and fly off. It wasn’t a very attractive design; like most solar fountain designs that you see on the Internet, ours was 100% kitsch. But it gave us immense joy.
These toys do not have a battery; they work only in direct sunlight. And once the solar panel wears off—which is probably what happened to the sunflower and the fountain—they stop working altogether.
The solar garden lights are more talking-point than utility: they look nice at night but are not a replacement for the regular bulb. Unlike the sunflower, the rainbow-maker and the fountain that work only in direct sunlight, the solar lights use a different principle: They have batteries that get charged during sunlight hours and you switch them on at night (some have a sensor and switch on automatically at sunset). These rechargeable batteries last about two years and are quite expensive to replace as compared to the regular batteries that go into the TV remote or the digital clock on the wall.
A few years ago, I picked up a solar lamp for my desk from an Ikea store in the US. Not that I needed one, but it’s hard to resist Ikea products. I liked the bright yellow colour and the minimalist design, and the price (around $20, or Rs 1,075) was just right. These lamps have LEDs (light-emitting diodes) that last longer than traditional bulbs. Some months ago, the batteries drained out. After checking the price in our local market (about Rs 600 for a set of three), I decided not to replace them.
Instead, for Rs 850 I picked up a nice-looking solar lamp (not as sleek as Ikea but definitely sturdier) called Sun King. Designed by an American company, Greenlight Planet (they have an office in Mumbai), Sun King gives much more light than my Ikea lamp and also lasts longer on a day’s charge. You hang the solar panel in the sun outside a window, and keep the lamp in the room. The manufacturers claim that it gives 16 hours of light from a full day’s exposure to sunlight, and also has a longer battery life.
My problem with most solar products sold in India (I mean lamps and lights and not the heavy-duty geysers) is their horrendous design. Just because they are made for rural use doesn’t mean that they should be ugly. I’ve come across a few exceptions on websites of Indian companies, but the choice is rather limited. As for solar toys like the floating fountain or the rainbow-maker, I have not seen a single Indian product. Pity, because they are such a lot of fun.
Shekhar Bhatia is a former editor, Hindustan Times, a science buff and a geek at heart